Well 5 Retaining Wall

Well 5

  • A portion of the retaining wall between the Well 5 driveway and the boulevard of English Avenue is failing. Engineering design is underway to replace the entire wall with a prefabricated modular block wall, using much larger blocks, and with a new drain tile system
City of Farmington | All Rights Reserved | Powered by CivicLive | © 2024 Civiclive.